This service enables fire safety companies and consultants to approve interior design drawings for buildings and establishments, in accordance with the requirements of the UAE CODE.
This service enables fire safety companies and consultants to approve interior design drawings for buildings and establishments, in accordance with the requirements of the UAE CODE.
Companies / Government
For consultants:
For installation and maintenance companies:
This service enables consultants to approve the drawing for an additional building to an existing building.
This service enables the new consultant or the fire protection companies to change the consultancy office responsible for the project.
This service enables consultants and fire companies to issue a completion certificate verifying that the residential houses conform to the drawing approved by the Authority.
This service enables consultants to issue a completion certificate, after verifying that the building conforms to the approved engineering drawings.
This service enables consultants to re-approve the engineering drawings for residential houses after the drawing has been amended.
A service for consultants to issue an interior design completion certificate, after verifying conformity with the approved drawings.
This service enables consultants to re-approve the engineering drawings, either for the purpose of amending the drawing or because one year has passed since the drawing was originally approved. This must be done before applying for the building completion certificate.
This service enables consultants to approve engineering drawings, which include life safety drawings and fire fighting equipment for building and establishment projects, in accordance with the requirements of the UAE CODE
This service enables consultants to request an engineering consultation from the Sharjah Civil Defense Authority to clarify fire prevention and safety requirements, or to find alternative design solutions for the project according to the UAE CODE.
This service enables consultants to re-approve the drawing for an additional building to an existing building, either for the purpose of amending the drawing or because one year has passed since the drawing was originally approved, and this must be done before applying for the building completion certificate.
This service enables consultants to approve residential house drawings, including detailed drawings for the early warning system, in accordance with the requirements of the UAE CODE.
